Multifamily EV Charging for Apartments & HOAs in Portland, Oregon
Residents are asking for charging, and the garage was wired before anyone planned for it. We design and install EV charging for apartments, condominiums, and HOA communities, from a load study of the existing service to chargers, load management, and EV-ready raceways for the spaces that come next.
- OR CCB #195783 · ELEC C818
- Licensed, bonded & insured
- 24/7 emergency response
- Generac Authorized Dealer
Multifamily EV charging is charging infrastructure for apartment, condominium, and HOA parking. Paramount Electric Co. performs the load study, designs the power distribution and load management, pulls permits, coordinates with the utility, and installs the chargers and EV-ready raceways for multifamily properties across the Portland metro.
How do you add EV charging to an apartment building?
It starts with capacity. We review the building's service and house-panel loads to determine how much power is actually available, then design to it: where chargers go, how they are fed, how the power is shared, and how use is metered or billed. The answer is rarely one circuit per space. A managed system serving many spaces from limited capacity is usually the practical design for an existing building.
Load management instead of a service upgrade
Networked chargers can share a fixed amount of power, slowing or staggering charging as more vehicles plug in. Because most cars are parked overnight, a managed group of chargers can serve far more spaces than the same capacity would support as dedicated circuits. That can defer or avoid a service upgrade, which is typically the largest single cost in a multifamily project.
EV-ready parking in new construction
New multifamily projects in Oregon are subject to requirements for EV-ready parking, and the details change. We confirm the current rule for your jurisdiction and project type at design, then build to it: panel capacity, raceways, and termination points sized so chargers can be added without opening finished walls or trenching finished pavement.
HOAs and condominiums
Condominium garages raise their own questions: who pays for the infrastructure, whether power comes from the house meter or the owner's unit, and how an owner's request is handled fairly for the next owner who asks. We give boards a building-wide plan — capacity, a standard installation method, and a per-space cost approach — so that each request follows the same path.
Incentives and utility coordination
Utilities serving the Portland metro have offered incentives for multifamily and commercial charging, and program terms change. We check what is available for your property's utility when the project is scoped and provide the documentation the application requires. Where the design does call for added capacity, we coordinate the service work with the utility.
How multifamily charging is priced
After the load study we provide a fixed price for a defined scope: the distribution, raceways, chargers, and commissioning. Phases and optional spaces are priced as separate add-ons so an owner or board can approve the first group and budget the rest. Conditions that could not be seen in advance are handled by written change order.
Who We Do This Work For
Our Process, Step by Step
- Site walk & load studyWe review the service, panels, and parking layout and determine available capacity.
- DesignCharger locations, feeders, load management, and a metering approach.
- BidA fixed price for phase one, with later phases priced as add-ons.
- InstallPermitted work scheduled to keep parking and common areas usable.
- CommissionChargers activated and tested, and management shown how the system operates.
Code & permits
EV charging equipment is installed under the Oregon Electrical Specialty Code, which treats chargers as continuous loads and recognizes energy-management systems that limit the combined draw. Every installation is permitted and inspected through the local jurisdiction. EV-ready requirements for new multifamily construction are set by the state and local codes in effect when the project is permitted, and we confirm them for each project rather than assume.
Who issues electrical permits in Oregon →Multifamily EV Charging — Questions We Hear
Who installs EV chargers for apartment buildings in Portland, Oregon?
Does our building need a service upgrade to add chargers?
How do residents pay for the electricity?
What does EV-ready mean?
Are there incentives for multifamily EV charging?
Can you install charging in a surface lot rather than a garage?
Multifamily EV Charging Work We Can Show You
Field Notes on Multifamily EV Charging
Multifamily EV Charging across the Portland metro
Working with a contractor for the first time? Start with Paramount Electric Co. — or see how we work with facility & property managers and general contractors.
Ready to talk about multifamily ev charging?
Send plans and a scope for a complete bid, or call to talk through the project.

