Oregon

Multifamily EV Charging for Apartments & HOAs in Portland, Oregon

Residents are asking for charging, and the garage was wired before anyone planned for it. We design and install EV charging for apartments, condominiums, and HOA communities, from a load study of the existing service to chargers, load management, and EV-ready raceways for the spaces that come next.

  • OR CCB #195783 · ELEC C818
  • Licensed, bonded & insured
  • 24/7 emergency response
  • Generac Authorized Dealer
The short answer

Multifamily EV charging is charging infrastructure for apartment, condominium, and HOA parking. Paramount Electric Co. performs the load study, designs the power distribution and load management, pulls permits, coordinates with the utility, and installs the chargers and EV-ready raceways for multifamily properties across the Portland metro.

How do you add EV charging to an apartment building?

It starts with capacity. We review the building's service and house-panel loads to determine how much power is actually available, then design to it: where chargers go, how they are fed, how the power is shared, and how use is metered or billed. The answer is rarely one circuit per space. A managed system serving many spaces from limited capacity is usually the practical design for an existing building.

Load management instead of a service upgrade

Networked chargers can share a fixed amount of power, slowing or staggering charging as more vehicles plug in. Because most cars are parked overnight, a managed group of chargers can serve far more spaces than the same capacity would support as dedicated circuits. That can defer or avoid a service upgrade, which is typically the largest single cost in a multifamily project.

EV-ready parking in new construction

New multifamily projects in Oregon are subject to requirements for EV-ready parking, and the details change. We confirm the current rule for your jurisdiction and project type at design, then build to it: panel capacity, raceways, and termination points sized so chargers can be added without opening finished walls or trenching finished pavement.

HOAs and condominiums

Condominium garages raise their own questions: who pays for the infrastructure, whether power comes from the house meter or the owner's unit, and how an owner's request is handled fairly for the next owner who asks. We give boards a building-wide plan — capacity, a standard installation method, and a per-space cost approach — so that each request follows the same path.

Incentives and utility coordination

Utilities serving the Portland metro have offered incentives for multifamily and commercial charging, and program terms change. We check what is available for your property's utility when the project is scoped and provide the documentation the application requires. Where the design does call for added capacity, we coordinate the service work with the utility.

How multifamily charging is priced

After the load study we provide a fixed price for a defined scope: the distribution, raceways, chargers, and commissioning. Phases and optional spaces are priced as separate add-ons so an owner or board can approve the first group and budget the rest. Conditions that could not be seen in advance are handled by written change order.

Who it's for

Who We Do This Work For

Apartment owners & developersCharging as an amenity, sized to what the service supports, with room to grow.
Property managersA clear answer for residents who ask, and a system that does not create billing work.
HOA & condo boardsA fair, repeatable plan for owner requests and shared infrastructure.
General contractorsEV-ready scope on new multifamily built to the current rule and priced in the electrical bid.
How it runs

Our Process, Step by Step

  1. Site walk & load studyWe review the service, panels, and parking layout and determine available capacity.
  2. DesignCharger locations, feeders, load management, and a metering approach.
  3. BidA fixed price for phase one, with later phases priced as add-ons.
  4. InstallPermitted work scheduled to keep parking and common areas usable.
  5. CommissionChargers activated and tested, and management shown how the system operates.

Code & permits

EV charging equipment is installed under the Oregon Electrical Specialty Code, which treats chargers as continuous loads and recognizes energy-management systems that limit the combined draw. Every installation is permitted and inspected through the local jurisdiction. EV-ready requirements for new multifamily construction are set by the state and local codes in effect when the project is permitted, and we confirm them for each project rather than assume.

Who issues electrical permits in Oregon →
Common questions

Multifamily EV Charging — Questions We Hear

Who installs EV chargers for apartment buildings in Portland, Oregon?
Paramount Electric Co. designs and installs multifamily EV charging for apartments, condominiums, and HOAs across the Portland metro, including the load study, permits, utility coordination, and installation.
Does our building need a service upgrade to add chargers?
Often not for a first phase. A load study shows the available capacity, and a load-managed system can serve a number of spaces from it. We tell you where the limit is before you commit.
How do residents pay for the electricity?
Options include networked chargers that bill the driver, sub-metering, or a flat fee set by the owner or association. We design the electrical side to suit the approach you choose.
What does EV-ready mean?
EV-ready parking has the panel capacity and raceway in place so that a charger can be added later without major construction. Requirements for new multifamily buildings exist in Oregon, and we confirm the current rule for each project.
Are there incentives for multifamily EV charging?
Utility and state programs have offered them, and terms change. We check current availability for your utility and property type when we scope the project.
Can you install charging in a surface lot rather than a garage?
Yes. Surface lots need underground feeds and pedestal or pole-mounted chargers, and we coordinate the trenching and restoration with the electrical work.

Ready to talk about multifamily ev charging?

Send plans and a scope for a complete bid, or call to talk through the project.