Whether you're adding two chargers for employees or building out a fleet depot, commercial EV charging is an electrical infrastructure project first. We design and install workplace, fleet, multifamily, retail, and public charging stations across Oregon, including the service capacity, load management, and incentive paperwork that make projects pencil.

  • OR CCB #195783 · ELEC C818
  • Licensed, bonded & insured
  • 24/7 emergency response
  • Generac Authorized Dealer
The short answer

Paramount Electric Co. installs commercial EV charging for workplaces, fleets, apartment communities, retail, and hotels across the Portland metro. We start with a load calculation on the existing service, design the distribution and load management, install Level 2 or DC fast chargers, and handle the permit and utility coordination.

Fleet and workplace charging

Fleet depots need reliable charging on a schedule, and workplaces need chargers that don't overload the building. We perform the load study, design the distribution, and install networked Level 2 or DC fast chargers with load management so you can add ports later without another service upgrade.

Multifamily and mixed-use

Apartments and condos need charging that's fair to residents and manageable for owners. We install metered, networked chargers, EV-ready conduit for future spaces, and power-sharing systems that fit the building's existing service.

Incentives and utility coordination

PGE and Pacific Power offer commercial EV charging incentives, and Oregon programs add more. We coordinate the utility service work and provide the documentation your incentive application requires.

How do you add EV chargers without upgrading the electrical service?

With load management. Most commercial buildings have less spare capacity than a row of chargers would draw at full power, but vehicles rarely need full power all at once. Load management shares a fixed amount of capacity across the ports, slowing some sessions when demand is high. It often turns a service upgrade into a panel and a feeder. Where the building truly is out of capacity, we design the upgrade and coordinate it with PGE or Pacific Power.

Level 2 or DC fast charging?

It comes down to how long the vehicle sits. Level 2 suits anywhere cars park for hours — workplaces, apartments, hotels, and fleets that return overnight. DC fast charging suits quick turnarounds: fueling sites, retail stops, and fleets that run multiple shifts. DC fast chargers draw far more power, usually need a new or larger three-phase service, and involve the utility from the first conversation, so they are planned as infrastructure projects rather than equipment installs.

Fleet charging: our Hillsboro reference project

Our commercial EV fleet charging project in Hillsboro is the case study for depot work: distribution designed for the fleet's charging schedule, networked chargers with load management, and capacity planned for the vehicles the operator intends to add. Fleet projects start from the duty cycle — how many vehicles, how far they drive, and how long they're parked — and the electrical design follows from that.

The site work is most of the job

The charger is the visible part. The cost and schedule are in what feeds it: trenching across finished parking, conduit routing through structured garages, bollards and pedestals, panel and transformer locations, and restoration afterward. Installing extra conduit for future ports while a trench is open costs little and saves a second excavation, so we price EV-ready capacity alongside the chargers you want now.

Networking, billing, and access

Networked chargers let an owner set who can charge, what it costs, and when. We install ChargePoint, Tesla, Wallbox, and other commercial platforms and recommend hardware based on your users and billing needs. Commissioning includes getting the chargers online and walking your team through the management portal.

Who it's for

Who We Do This Work For

Fleet & operations managersVehicles charged on schedule, with capacity to add more without another service upgrade.
Property owners & managersCharging that fits the building's service and a plan for who pays for the power.
Multifamily owners & HOAsFair, metered charging for residents and EV-ready capacity for future spaces.
General contractors & developersEV infrastructure in the electrical bid, coordinated with site work and the utility.
How it runs

Our Process, Step by Step

  1. Site assessmentWe walk the parking area and electrical room and run a load calculation on the existing service.
  2. Design & quoteCharger count, load management, trenching route, and any service work, priced as one scope.
  3. Permit & utilityElectrical permit, and utility coordination where a new or larger service is needed.
  4. InstallConduit, trenching or surface raceway, feeders, pedestals, chargers, and network commissioning.
  5. CloseoutInspection, activation, a walkthrough of the management software, and incentive documentation.

Code & permits

EV charging equipment is installed under NEC Article 625 as adopted in the Oregon Electrical Specialty Code and requires an electrical permit and inspection. Accessibility requirements can apply to public and shared charging spaces, and we coordinate those with the owner's design team.

Who issues electrical permits in Oregon →

Multi-site & facility service

For brands, property managers, and fleet operators with several sites, we run charger installations and repairs across Oregon locations under one point of contact, with the same documentation at every site.

Electrical service for facility managers →
Common questions

Commercial EV Charging Stations — Questions We Hear

How many chargers can my building support?
That depends on available service capacity. We start with a load calculation, then use load management to maximize ports on your existing service, or design a service upgrade if the site needs one.
Do you install DC fast chargers?
Yes. DC fast charging usually requires a new or upgraded service and close utility coordination, which we handle as part of the project.
Which charger brands do you install?
ChargePoint, Tesla, Wallbox, and other networked commercial platforms. We'll recommend the hardware and software that fit your site, users, and billing needs.
Who installs commercial EV charging stations in Portland, Oregon?
Paramount Electric Co. installs workplace, fleet, multifamily, retail, and hotel charging across the Portland metro, including the service, distribution, and load management behind the chargers. We are a licensed Oregon electrical contractor, CCB #195783.
Do commercial EV chargers need a permit in Oregon?
Yes. New charging circuits require an electrical permit and inspection from the building department with jurisdiction. We pull the permit as part of the project.
Are there incentives for commercial EV charging?
Utilities and state programs offer incentives that change over time and depend on your utility and site type. We confirm what's currently available for your project and provide the documentation the application needs.
Can you install conduit now for chargers later?
Yes, and it's usually the cheapest moment to do it. EV-ready conduit and panel capacity installed during construction or while a trench is open lets you add ports later without tearing up parking.