She texted a photo at 9 at night. Square D, 100 amps, tandems in every other space, a water heater and a dryer sharing a look that made me wince. 'Can you just put a bigger breaker in?' No. The main is the main. An electrical panel replacement in Oregon starts with that photo and ends with a PGE truck, not with a breaker we had in the van.

The number people pick before we show up

Honestly, a lot of 100-amp services in older Portland houses are fine. They get into trouble when the heat pump shows up, or the car, or both. We still run the calc. Square footage, the furnace, the range, whatever you're about to plug in. A 48-amp charger is not a 'small add.' Neither is heat strips on a cold morning.

Sometimes the calc says stay at 100 and add a subpanel because you only ran out of spaces. Sometimes it says the service itself has to grow. I don't like guessing that off a text. The panel upgrades page is where the work gets booked. This is the messy middle.

Mast, meter, dirt

Overhead is the short version if the mast isn't rotten where it goes through the roof and you can stand in front of the can without opening a door into it. We pull the permit (Portland's bureau if you're in the city, the county if you're not), PGE or Pacific Power gives a window, the meter comes out, and the house is dark until the inspector has looked at the grounds.

Underground is where the quote changes. I've pulled a sweep full of mud. Aluminum service cable with the insulation nicked. A meter screwed to a deck that grew around it so the working clearance is a flower pot. That isn't a same-day surprise if we looked first. If we didn't look, that's on us.

Conductors that won't reach

Cloth. Short copper. Aluminum branch that needs a proper pigtail, not a twist and a prayer under the lug. A bond clamp on a PEX line because the galvanized pipe left years ago and nobody moved the bond. We splice in a box when the wire is too short. We don't tug it.

Labeling happens while it's dead. The old directory will lie to you. If the freezer and the garage door are on one breaker, you should hear that from us, not from warm ice cream.

Then the utility comes back

No reconnect without the inspection. We've seen the other kind at a sale: cover comes off, permit history is empty, everybody argues. The 100-amp piece is for the 'do I need this' question. Same people either way.

A pharmacy board we opened in Newberg failed the same way a house panel fails. Heat at a lug, then an arc. Different gear, different hour (after close), same physics. Say if the building is commercial when you call. The shutdown is the whole conversation.

What the morning actually looks like

Permit in the folder. Utility window confirmed the afternoon before, because those windows move and I don't like telling someone at 7:40. Fridge stays closed. Garage door left where you can live with it. If a machine in the house can't go dark, that plan exists before we touch the meter ring.

Sequence is dull. Meter out. Old can off the wall. New enclosure up. Neutrals and grounds landed where this year wants them (the bond is the one jumper that belongs, and only at the service disconnect). Branch circuits moved one at a time so a kitchen hot doesn't marry a bedroom neutral. Short wire gets a box and a splice, not a tug. Torque marks. Directory written while we still remember which cable was which.

Inspector wants the grounds, the clearance, the mast if we touched it. Then the utility. We bring loads up in an order that doesn't smack the new main: lights, fridge, heat. A breaker that opens gets chased before we roll. Clean overhead, that's the day. Soft mast boot or a swamp in the sweep, and you already heard the day would run long. Keep the permit card. The next sale asks for it, and 'we had it done' without a number is how deals stall in a kitchen while someone opens the cover. Aluminum service entrance cable with nicked insulation does not get taped and reused. It gets replaced. That's a fight I've had on a ladder, and the inspector has always agreed with the ladder.

After the truck leaves

Walk the house with the directory in your hand. Flip a breaker, see what dies, and tell us if the label is wrong before we are off the street. A mislabeled freezer circuit is the kind of mistake that shows up on a Sunday. We'd rather fix it while the cover screws are still in the pouch.

Common questions

How long is the power actually off?
The working day, if it's a clean overhead change. The utility's window is theirs, not ours. A bad mast or a buried feed is longer, and the quote should already say that.
Do we have to leave?
Most people stay. The fridge stays shut. Medical gear needs a plan before the meter comes out.
Zinsco or Federal Pacific that hasn't burned yet?
Replace it. Those breakers have a history of not opening. 'It hasn't failed' is not a test.
Does 200 amps mean I can add the car later?
Usually you've got room. We still calc the charger when you buy it. Empty spaces get eaten by tandems if nobody thinks ahead.
Written by the licensed electricians at Paramount Electric Co. (OR CCB #195783 · ELEC C818) and reviewed by Maurice Greven, Project Manager / Supervisor, who holds Oregon supervising electrician license #4828S. Have a job this applies to? Call (971) 471-7897 or request service online.

Photo of the panel, photo of the meter

We'll say service change, same-size replacement, or a subpanel. Price before anybody pulls the meter.