COMMERCIAL Tualatin, OR · 2025

Super Chix Restaurant Build-Out

Full electrical build-out for a Super Chix franchise restaurant — commercial kitchen, dining room lighting, signage power, and brand-standard finishes on a hard opening date.

Super Chix Chicken & Custard storefront with new illuminated channel-letter signageCommercial
400A
Service size
60+
Kitchen circuits
On date
Opened

The Challenge

Franchise openings are immovable: marketing, staffing, and inventory all aim at one date. Kitchen equipment specs arrived in waves, with several late substitutions changing circuit requirements mid-rough-in.

Our Approach

We tracked the equipment schedule line by line, roughed in flexible capacity where substitutions were likely, and kept the inspector informed of revisions so nothing stalled at final.

The Result

The restaurant opened on its announced date with every piece of kitchen equipment commissioned and operating.

MORE Similar projects

Planning something similar?

Tell us about your project — we'll scope it, bid it, and build it right.