Clackamas, OR · 2026

Pediatrics Clinic Standby Generator

Completed 150 kW natural-gas standby system for an outpatient pediatrics clinic — liquid-cooled generator in a sound-attenuated enclosure, 600A automatic transfer switch, and a dedicated 120/208V three-phase standby distribution panel.

Commercial standby generator in a sound-attenuated outdoor enclosure beside a buildingCommercial
150 kW NG
Generator
600A ATS
Transfer switch
120/208V 3Φ
Standby panel
12,000 sq ft
Clinic size

The Challenge

An outpatient pediatrics clinic can't treat a power outage as an inconvenience: vaccine and medication refrigeration, exam-room equipment, IT, and security all have to ride through utility interruptions, and the generator has to live quietly next to a working medical building. Final sizing and any required separation of life-safety loads were confirmed through load calculations before installation.

Our Approach

A 150 kW liquid-cooled natural-gas unit in a sound-attenuated enclosure feeds a dedicated standby panel through a 600A automatic transfer switch. Automatic load management stages HVAC startup and sheds nonessential loads so refrigeration, selected exam-room receptacles, essential lighting, IT/network, and security always hold priority.

The Result

The system is installed, commissioned, and carrying the clinic's critical loads. Load-bank testing verified full-capacity performance, remote monitoring is online, and staff were trained on operation and monthly exercise cycles before handoff.

Questions from the job

Do you do standby generator installation and electrical services in Clackamas?
This clinic is the example. 150 kW liquid-cooled on gas, 600-amp automatic switch, a 120/208 three-phase standby panel of its own. Pad, feeders, gas coordination, permit, startup, load-bank. One electrical contract. Not a generator peddler plus an electrician we met at the pre-con.
What did it actually carry?
Med and vaccine refrigeration, some exam receptacles, the lights that had to stay, IT, security. HVAC starts in stages. Everything else can wait.
Why not put the whole building on the generator?
It trips. The standby panel is the list. Life-safety separation, if the occupancy needs it, is the engineer's call and the jurisdiction's. We don't freelance that.
Who services it after startup?
We do. They got a walk-through on the monthly exercise. Oil and a battery test are a different visit from the weekly crank.