Milwaukie, OR · 2020 – present · In progress

Ebenezer Church Full Remodel & Expansion

A full-scope remodel of Ebenezer Church — demolition of the old, new rooms, new panels and wiring, interior and accent lighting, exterior lighting, and HVAC system wiring, with our phase-one electrical work contributed as volunteer labor. Today we're back helping with the third-floor addition: a venue space and more classrooms.

Ebenezer Church in Milwaukie after its full remodel — modern metal-roofed building with dormersCommercial
1 / 3
Full remodel · 2020–2023
Phase one
Volunteer
Phase-one labor
3rd-floor addition
Current phase
Interior · accent · exterior
Lighting

The Challenge

This wasn't a refresh — it was a transformation. The original building came down to structure in phases between 2020 and 2023 and went back together as an essentially new facility, which meant the electrical system was rebuilt from the panels out: demo of the old, new distribution, new rooms, and lighting inside and out, all on a congregation's budget.

Our Approach

We carried the full electrical scope through the remodel — panels, wiring, interior and accent lighting, exterior lighting, and HVAC wiring — and contributed the phase-one work as volunteers, because this is our community and that's the kind of company we want to be. The relationship continues: we're now helping wire the third-floor addition, which adds a venue space and additional classrooms.

Current Status

A building that looks and works nothing like what it replaced, with electrical systems built for its next few decades. The before-and-after speaks for itself — and the project is still growing.

Before

1990s-era stucco building with aging electrical throughout

After

Rebuilt, expanded facility — new panels, wiring, and lighting inside and out

Similar projects

Planning something similar?

Tell us about your project — we'll scope it, bid it, and build it right.